The dam was federal flood control with mitigation for Steelhead of 170k a year. Then the power generation was added and funding for additional mitigation was added for Coho and additional Steelhead with Tacoma City Light putting the funding into an account that they did not have any control over. To put it simply the power company met the obligations of funding with WDFW being the entity that was charged with the responsibility of producing the required additional mitigation production.

TCL has zip zero just plain nothing to do with the failure to produce the mitigation fish, 100% WDFW for all these years. Comparing Wynoochee Mitigation to the Cowlitz is a bit miss guided to say the least.


Edited by Rivrguy (09/05/19 11:21 AM)
_________________________
Dazed and confused.............the fog is closing in