I think you're doing pretty well Andy. It took the electrician 8 days to wire my house. That filled up a 3' long 200 amp panel, so he tied in a sub-panel for me to do the garage. I spent most of Sunday doing two runs in the garage, but that included using the hole-saw for the 4 light fixtures that go on the front of the garage. I want to start the outlet runs tonight, but I realize I have all this lumber stacked against 3 garage walls that I'll have to move into the center so I can nail switch boxes to studs and drill holes. I'll be lucky just to get the lumber moved.

Sg