Just got back again
Don’t go up there if you don’t have to; there to many people just looking and getting in the way. Today the head quarter is set up at the Oso Chapel where you can view pictures of the slide
I haven’t seen a news paper or TV so if this is old news sorry
The slide came out over 600 feet for the toe of the hill; it has made about four or five channels to the south of the slide where the water is flowing now. When I left it was about 2200 cfs and going to 10,000 cfs by tonight (according To Army Corp personal). From 9:00am till noon today it had come up 4” vertical and it was raining.
Where you see the white trailer house the new channel (where the red line is) will be about 100 ft. north of it.

About the creeks; member of SIRC was up there yesterday and he told me today that there running into the slide and the slide material is like soup and that the creek on top (Rawling Creek? Red line) is much closer to the slide now. So this isn’t over yet.

Stillaguamish Tribe and Geo Engineering had placed stakes up there to measure water/slide (if it there was a slide) level but someone removed ALL there stakes from hill side and along the river. Very BAD thing to do!
Stillaguamish Tribe plan was going to happen this summer; but now the question is bigger because every thing has change a little.