Just came across this document.

DNS 20-004: CALAWAH WILD STEELHEAD BROOD STOCK PROGRAM AT THE BOGACHIEL HATCHERY


https://wdfw.wa.gov/sites/default/files/...chiel_hatch.pdf


This program replaces the current wild broodstock program on the Bogachiel River. Within the last couple years since the program has switched to the Bogachiel River, there have been two major landslides impacting efforts to obtain broodstock. The Calawah tends to run clearer during the winter months. Additionally, finding a suitable acclimation site has been problematic. The existing Calawah Acclimation site would provide a suitable site to release steelhead from. Approximately 19,000 2019 brood year juvenile steelhead from wild Calawah steelhead adults will be reared and released from Calawah Acclimation Pond into their natal stream at approximately RM 1. Release size will be greater than 10 fpp in April and May of 2020. Broodstock will be captured by hook and line or seine within the Calawah River primarily by local guide association members. Many of the drift boats have live tanks on board to accommodate holding of the wild steelhead. Adult steelhead will then be transferred to WDFW planting tanks where they are then transported to the Bogachiel Hatchery for holding until ready to spawn. Every attempt will be made to live spawn broodstock and return back to the Calawah. All released smolts will be adipose clipped with additional external mark or coded wire tagged.
Subsequent years will have a release goal of 35,000 to 50,000 progeny from wild parents.


Edited by bushbear (01/26/20 07:47 PM)