06/07/2022


The parking lot was being worked on yesterday, 06/06/2022.

What I saw:

1. Total lot size will be much smaller, I'd guess 25% - 33%, smaller.

2. Additional boulders were being brought in while I was there, but they were being placed in the lot, more to stop someone from driving into the river.

3. I don't know if there are plans to drive pilings, along the East and North of the parking lot........If not, and there is another major rain fall, could be a completely lost parking lot and maybe even the boat ramp itself.

4. I can tell the new channel is moving South, the further South the main river channel moves, the more direct will be the force of the river, against the East side of the parking lot...

Major work needs to be done.....could even affect the footings on the 107 Bridge.