I have done small portions of preliminary design work for a couple of different "wind farms" none of which have gotten past preliminary design and a lot of money spent on talking about wind farms.

All of which were essentially lining up for their subsidy, and when they got hung up in whatever environmental or nimby roadblock and realized they wouldn't hit the grant window gave up the ghost.
_________________________
WDFW - Turning outdoorsmen into golfers since 1994.