The lower Satsop, if you haven't been to the area, will have major changes from last year.

1. Change was necessary to protect pump station for water to the Nuke plant AND to Keys Road itself.

2. There has been many piling being driven, and logs used in, around, thru the piling to slow the river.

3. There is also piling being driven to the West of Keys Road. If you have bank fished the areas or boat run the lower part, from mouth up toward the bridges....I'm thinking major changes in river bed. Really hard to tell, right now, because of low water flow.

All this change will definitely cause "mud, sticks, etc." to be pushed in to the Chehalis and my fishing areas......grrrrrrr, might have to join the above Fuller Bridge horde of fisher people.

I know its early because Chehalis doesn't open for adult until 10/01/20 but now you'll know....

The following is information on this phase of the plan: There is a map, showing where the work is being done.....


https://www.ezview.wa.gov/site/alias__1492/37644/default.aspx

Big file......





Edited by DrifterWA (08/23/20 09:10 AM)
_________________________
"Worse day sport fishing, still better than the best day working"

"I thought growing older, would take longer"