There is LOTS of work taking place around the Keys Road area.....Time will tell, but it looks to me like the plan is to get the Satsop river back in the channel where it was a few years back, that's back EAST toward Keys Road.....by doing that the Willis property will have almost no impact.......but I see in the plans that a house will be moved away from the river is currently flowing.

Lots of piling being driven, time is short on.....wonder why work wasn't started a few weeks earlier????? Maybe smolt out go??????

Will be an interesting jet boat ride from Fuller Bridge, up the new channel re-build, past all the new pilings to the highway bridges......won't see this old man with his "River Wild boat" in that stretch of the river......


Edited by DrifterWA (08/29/20 07:50 AM)
_________________________
"Worse day sport fishing, still better than the best day working"

"I thought growing older, would take longer"