I talked with the GH County lead person on the project, Phase 1 is pretty much done.

Phase 2 will be either 2021 or 2022.

Part of the goal in phase 1 was to try and get the river to flow both in the old channel by the "pump house" AND to stay in the West channel. Satsop could have 2 mouths.

Mother Nature does what Mother Nature does....... West channel will be the main emphasis in Phase 2.

Don't have to tell most people BUT as a reminder.....when the "big rains" start, there will be lot's and lot's of xhit coming down the river and out into the Chehalis,,,,nothing worse than to be "on the hook" and look up river and see a tree or part of a lot jam coming at you........toilet paper time!!!!!



TWIDWELL AREA

THE BIG COTTEN WOOD TREE IS STILL LAYING FROM NORTH BANK, OVER TO THE SOUTH SIDE GRAVEL BAR.........ITS A NO GO, UNLESS GOING AROUND ON THE GRAVEL SIDE AT VERY HIGH WATER......BE SAFE!!!!!


Edited by DrifterWA (10/03/20 08:46 AM)
_________________________
"Worse day sport fishing, still better than the best day working"

"I thought growing older, would take longer"